MUTCDSEARCH · WORK ZONE TOOLS

Temporary Traffic Control Layout Planner V2

Conceptual stationing, calculated intervals, and synchronized overview/detail
⚠ Uncertified Conceptual Planning Reference Only. Not a field-ready design, engineering certification, or agency approval.

02 / Full sequence overview (broken axis — NOT to scale)

The intervals shown are real engineering station differences; each visual segment uses equal schematic space.

03 / Continuous-scale detail canvas

Pan by dragging empty roadway; drag orange warning-sign diamonds to simulate an obstruction. Mouse wheel or slider zooms the measured station axis. Green = suggested buffer, red = work zone.

Continuous scale in drawing: 1 ft = 1 px at 1× zoom. Transverse lane widths are illustrative, not scaled to longitudinal distances.

04 / Stationing & calculation export

Primary taper—feet
Max taper spacing—ft / channelizer
Taper devices—both endpoints included
Suggested buffer—Table 6B-2

This preview does not account for traffic volumes, sight distances, engineering judgment, taper-type applicability, TA selection, flaggers, pedestrians, lane-closure legality, or local supplements.